PHOTOGRAPHY SHOOT RISK ASSESSMENT
This document is intended as a basic template to assist in the completion of a risk ass...
Terrain Woodland Shoot ALL Camera, Tripod. -Take care on
muddy ground
-Only venture into
the woodland if the
terrain i...
of 2

Portait photography ra

1
Published on: Mar 4, 2016
Published in: Education      
Source: www.slideshare.net


Transcripts - Portait photography ra

  • 1. PHOTOGRAPHY SHOOT RISK ASSESSMENT This document is intended as a basic template to assist in the completion of a risk assessment for film production activities. Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained from the Health & Safety Executive www.hse.gov.uk When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further action(s) to be considered will be determined by the level of risk assessment. HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT? PERSON WHO MAY BE HARMED PROPERTY THAT COULD BE DAMAGED RISK CONTROLS ALREADY IN PLACE RISK ASSESSMENT *See chart FURTHER ACTION TO BE TAKEN Outside Interference Woodland Shoot ALL Camera, Tripod. -Ignore people if they interfere. -Walk away if necessary. -If animals, remain calm MODERATE -Work in a large group. Weather Woodland Shoot ALL Camera, Tripod. -Protective covering for camera -Cover lens if light rain. MODERATE -Check weather forecast for the day Wires, clutter, equipment. Photo Studio Shoot ALL Camera. -Allow for plenty of room -Watch out for any dangerous objects. LOW -Possibly move wires to safer positions.
  • 2. Terrain Woodland Shoot ALL Camera, Tripod. -Take care on muddy ground -Only venture into the woodland if the terrain is safe MODERATE -If needed, relocate to safer, dryer outdoor location. Risk Assessment Chart Hazard likelihood / Consequences RISK ASSESSMENT VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get seriously hurt) EXTREME Could happen or mild consequences (i.e. someone could suffer a minor injury) HIGH Unlikely to happen or minor consequences (i.e. production could be slightly delayed) MODERATE Rarely happens and very insignificant consequences LOW