Duane Pooley
Project Manager
As Project Manager, Duane Pooley is responsible for overseeing the construction projects. My
...
Pooley, Duane
Page 2
Finished ahead of Schedule and $8M under Budget. 2007- 2009
Construction Manager at the Phoenix Mill ...
Pooley, Duane
Page 3
Nv.
Construction Manager, Ruby Hill Gold Mine, Eureka, Nevada, location; Homestake Mining
Company, ow...
Pooley, Duane
Page 4
Battle Mountain Gold Company, owner. Construction of a 10,000 ton/day crushing and
screening facility...
Pooley, Duane
Page 5
USED BALL MILL, AND BOP. We preformed all with plant running in full operation.
Project Superintenden...
Pooley, Duane
Page 5
USED BALL MILL, AND BOP. We preformed all with plant running in full operation.
Project Superintenden...
of 6

POOLEY RESUME short

Published on: Mar 4, 2016
Source: www.slideshare.net


Transcripts - POOLEY RESUME short

  • 1. Duane Pooley Project Manager As Project Manager, Duane Pooley is responsible for overseeing the construction projects. My duties included ensuring that Project achieves the planned safety, quality, productivity and financial goals on each assigned construction project. As Project Manager, He has proven abilities and skills in leadership and management of people, training, negotiations, planning, organization, estimating, Hard Dollar, Suretrack, Primavera P3 and P6 CPM project scheduling. I have NCCER Cranes and Rigging Certifications, capable of crane lift planning and approving. 24 hour MSHA Training. Job cost forecasting responsible for P & L on all my Projects. Problem solving and reporting, contract negotiations and administration. I will set standards of excellence in leadership, safety, quality and productivity for my areas of responsibility and will be able to communicate and enforce your Company philosophies, policies, practices and procedures on all assigned projects. EXPERIENCE I have worked in the construction industry for over 36 year. Senior Estimator, I was stationed out of the Englewood, Co. office working on Industrial estimates and managing bid proposals for TIC. 2012- 2013 Project Manager Project Phoenix Mt. Pass, Ca. The owner is MolyCorp. This is a Rare Earths mine the largest in the US. We installed 3 Crushers 1 Jaw, 2 Cones, Screens, conveyors, Feeders, Stackers, Ball Mill, Flotation circuit, Concentration system, Paste Tails Plant with 3 large Filter Presses 30’x 8’, 82’ Thickener, and a Veolia Water Treatment Plant. Peak Manpower was just over 500. CV $85M. 2011- 2012 Senior Estimator, Project/Mechanical estimating in the Tucson office for 1 year. I typically did this between Projects. 2009- 2011 Project Manager Springerville Unit 4 Project, this is a sub- critical pulverized coal steam- electric generating station designed for a base load operation with a nominal net power output of 400 MW. We installed all the Electrical and Instrumentation, all Piping including the High Energy Chrome piping lines, all BOP Mechanical including the Steam Condenser and Boiler Feed Pumps, Coal Handling System, Bag House, Water Treatment System upgrade. Peak Manpower just over 400, Total hours worked just under 1 Million. CV $95M
  • 2. Pooley, Duane Page 2 Finished ahead of Schedule and $8M under Budget. 2007- 2009 Construction Manager at the Phoenix Mill Project in Battle Mt. Nv. For Newmont Mining Corporation. I worked for the general contractor on the installation of a 35,000 TPD gold process concentrator. we installed 2 Ball Mills 21’x 33’, 1 Gearless Sag Mill 36’x 16.5’, 1 Gyratory Crusher 50”x 65”, 1 Cone Crusher, Conveyors, 2 Stackers, 4 Feeders, Flotation Cells, CIP Cells, a Gold Refinery, Filtration Units, Copper Concentrate Load Out and BOP Equipment. Peak Man Power over 300, Total hours worked over ½ Million. CV $60M. 2007-2008 Construction Manager, Santan Expansion Project, Gilbert, Arizona, location; Salt River Project, owner; Sargent & Lundy, engineers. I worked for the general contractor on the installation of Electrical, Mechanical Equipment and Above Ground Piping for a 2 on 1 GE 7 FA 550MW Combined Cycle Power Plant. 2 Alstom HRSGs with Duct Firing Burners and SCRs. Peak Man Power over 500, a new Water Treatment Plant. Steam Blows and Start-up. Total hours worked over ¾ of a Million. CV $43M Construction Manager, Kyrene Expansion Project, Tempe, Arizona, location; Salt River Project, owner; Stanley Consultants Inc. engineer. We performed the mechanical and electrical Heat Recovery Steam Generator and Balance of Plant installations for a 1 on 1 - 250 MW Combined Cycle Power Plant. The power generation equipment installed was a GE 7FA Combustion Turbine/Generator and a GE A10 Steam Turbine/Generator installed by others. The major equipment installed was an Alstom 2x5-3 pressure level boiler, Alstom Condenser, GSU transformers, new water treatment facilities, 2500 HP boiler feed and 800 HP circulating water pumps, and miscellaneous pumps, transformers, and electrical equipment. Steam Blows and Start- up. Peak Manpower 250 CV $34M Construction Manager, West Phoenix Unit 4 Expansion Project, location; Phoenix, Arizona, owner; Pinnacle West Energy, Engineer; Utility Engineers. We were a joint venture partner with UE for the plant design, construction and balance of for a 1 on 1- 120 Mw Combined Cycle Power Plant Expansion. Upgraded the Water Treatment Plant. Peak Manpower 120 CV $30M We Finished 2 months ahead of schedule. Construction Manager, Oxygen Plant, Carlin, Nevada, location; Air Products and Chemicals, Inc., owner/engineer. I worked for the general contractor on installation of the mechanical, piping, E&I for an 1100 TPD Oxygen Plant that supplies oxygen to the Newmont Roster. Construction Manager, Low Nox Burner Project, Moapa, Nevada, location; Nevada Power Company, owner, Foster Wheeler Energy Corporation, Construction Manager and Engineer. TIC was the general contractor for installation of the low Nox Burners, ancillary equipment, all electrical and Instrumentation, Rebuilt 2 -100 MW Coal Fired Boilers, and upgraded to a DCS Controls System at the Reid Gardner Station Units 1 & 2. It is located 50 north of Las Vegas,
  • 3. Pooley, Duane Page 3 Nv. Construction Manager, Ruby Hill Gold Mine, Eureka, Nevada, location; Homestake Mining Company, owner; Kilborn International, Inc., construction manager and engineer. TIC was the general contractor for the construction of a 3,500 TPD Gold Mill utilizing Crushing, Grinding, leaching and refining to produce gold. We constructed a new water treatment plant. This was a grass-roots project with two ore bodies, low grade (to a leach field) and a high-grade ore processed by conventional means. We installed 1 used Kue-ken jaw Crusher, 1 Cone Crusher, 1 used Ball Mill 10.5’x 16’, several Conveyors, 2 Belt Filters, Agglomeration Drum, Feeders, BOP Equipment. A new Truck Shop for the Mine Haul Trucks. Peak Manpower 100, CV $15M Project Manager, Reclaim Modifications, Ely, Nevada, location; BHP Copper, Inc., owner; ICF Kaiser Engineers, Inc., engineers. I worked for the general contractor on modifications to the Coarse Ore System which included Rebuilding the reclaim tunnel. Three primary belt feeders were removed by disassembling and removing through the existing ore slots of the reclaim tunnel. Replaced the Feeder support Steel with heaver members. Concrete penthouses were demolished and the concrete ore slots extended. Electrical work included installation of a new duct bank from the electrical room to the reclaim tunnel cable tray, saw cut new openings in 6’ thick concrete reclaim tunnel, and all associated connections for the by-pass conveyor and new Apron feeders. During this work the Plant ran full production using a temp by-pass Conveyor we installed. This work was preformed over an operating Sag Mill Feed Conveyor and we never had an unplanned shut-down. Project Manager, Production Shaft Head frame, Golconda, Nevada, location; FirstMiss Gold, Inc., owner and engineer. TIC was the general contractor for the construction of an estimated 2,000' mineshaft head frame. This included construction of the No. 2 shaft collar, subcollar and hoist House, erection of the No. 2 shaft head frame and backlegs which included 330 tons of owner- supplied structural steel. Rebuild and install used Hoist. Mechanical/Structural Superintendent, Robinson Project, Ely, Nevada, location; Magma Nevada Mining Company, owner; ICF-Kaiser Engineers, Inc., engineers. Scope of work was construction of a 46,000 TPD sulfide copper concentrator facility utilizing crushing, reclaim, grinding, flotation and loadout circuits to produce 600 to 700 TPD copper concentrate. I was over all the Structural and Mechanical work. 2 BALL MILLS 20’X 30’ each had a 8750 HP Drive Motor, 1 SAG MILL 32’X 15’ with 2-5000 HP Drive Motors, 2 Tower Mills 11’x 40’, 1 Gyratory Crusher 54’x 74’, Conveyors, 760’ Stacking Conveyor with a 750 hp drive motor, Water Treatment Plant, Feeders, Tanks, Sumps, Flotation, Filtration, Copper Concentrate Load Out, 2-230’diameter Tailings Thickeners, bop, ect.. We erected over 4,700 tons of steel. Peak manpower 447, Total man hours spent just over 1 Million. CV $65M Project Superintendent, Reona Project - Crushing Plant, Battle Mountain, Nevada, location;
  • 4. Pooley, Duane Page 4 Battle Mountain Gold Company, owner. Construction of a 10,000 ton/day crushing and screening facility. 1 Jaw Crusher and 1 Cone Crusher, several Conveyors and Feeders. Project Superintendent, Sulfide Plant, Valmy, Nevada, location; Lone Tree Mining, Inc., owner; Kilborn Engineering, engineer. TIC was the contractor for the Lone Tree 2500 TPD sulfide mill. We installed all Piping, Electrical, Instrumentation, Structural Steel, 1 Autoclave, Geho Autoclave Feed Pumps, 1 Boiler and bop Equipment. Project Superintendent, Oxygen Plant, Valmy, Nevada, location; Air Products & Chemicals, Inc., owner/engineer. TIC was the general contractor for the construction of a 225 TPD oxygen plant. We installed all Concrete, Structural Steel, E&I, Piping, Insulation, Plant Equipment, and Start- up. Area Superintendent, Rye Patch Geothermal, Humboldt, Nevada, location; Rye Patch Ltd. Partnership, owner. TIC was the EPC contractor for the construction of a 12.5 Mw geothermal power plant including plant and gathering system and substation. Project Superintendent, North Block Leaching Facility, Carlin, Nevada, location; Barrick Goldstrike Mines, Inc., owner; Kilborn Management Services, Inc., engineer. This was a “State of the art” Heap Leach Process. Scope of work included the installation of the leach area pond pumping, piping, all E&I work, Structural Steel, Plant Equipment for the gold absorption facilities. Project Superintendent, Phase II, Barrick Gold Strike Mines, Inc., owner; Kilborn Management Services, engineer. TIC was the general contractor for Barrick Goldstrike Mines, Phase II Expansion including additional grinding circuit and two new autoclaves with associated leaching, stripping and refining systems. I was over the grinding circuit, 1 ball mill 16.5’x 30.5’,1 sag mill 12’x 24’ 1 cone crusher, 1 rotary kiln upgrade the cil area, and bop. Area Superintendent, Barrick Grinding Facility, Carlin, Nevada, location; Barrick Goldstrike Mines, Inc., owner; Kilborn Management Services, Inc., engineer. TIC was the general contractor for installation of grinding facilities including SAG mill, ball mill and conveyor system and related piping and pumping systems. Project Superintendent, Second Sleeper Mill Expansion Project, Winnemucca, Nevada, location; Nevada Gold Mining, Inc., owner; BEI Engineers. TIC was the general contractor to expand the milling capacity of the existing Sleeper Gold Project, from 1500 TPD to 3000. WE ADDED A
  • 5. Pooley, Duane Page 5 USED BALL MILL, AND BOP. We preformed all with plant running in full operation. Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location; Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of work included the electrical portion of the addition of two-tertiary crushers, two conveyors and associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop; we preformed all work with plant running at full operation.
  • 6. Pooley, Duane Page 5 USED BALL MILL, AND BOP. We preformed all with plant running in full operation. Project Superintendent, Denton-Rawhide Tertiary Crusher Addition, Fallon, Nevada, location; Kennecott Rawhide Mining Company, owner; Roberts & Schaefer Company, architect. Scope of work included the electrical portion of the addition of two-tertiary crushers, two conveyors and associated sub-systems. We added 2 cone crushers and conveyors, 2 vibratory screens and bop; we preformed all work with plant running at full operation.