Preparing for a SanFranciscan Earthquake By Luke He!um
Supply List 11 gallons of water for each family member Hand crank flashlight and radio Non-perishable foods for 1 week for ...
Preventing Death Strict building code Mandatory backflow valves Stops unsanitary spreading of disease Educate the roug...
Routes to Leave Zone 1Zone 1 and all west of the Bay Zone 2 Half Moon BayRed part of zone 2 San...
Best Routes Zone 1 Zone 1 Zone 2 280 S San Bruno and Redwood CityZone 2 580, 680 Lafaye...
Directions Out Zone 1: http://maps.google.com/maps?f=d&source=s_d&saddr=San+Francisco,+CA&daddr=Campbell,+CA&hl=en&geoc...
How to Flee Fleeing necessary to avoid largest earthquake If no car/highway damage, families would drive to the refugee zo...
Stopping a RepeatMake sure residents areequipped with fresh water andfoodMake sure large water reserveson tap for fighting ...
Reducing Disease500,000 households outfit with backflow valves $150 apiece, but $125 tax credit. Stops disease and sewage ...
Recovery	Temporary one room houses for400,000 displaced $500 million$250 tax credit if moved in with familyRubble cleari...
Total Cost 150000 for seismic stations 6.1 million for education 12.5 million for back flow valve tax credit 150 million fo...
of 11

Natural Disaster Evacuation Plan

Saving San Francisco from destruction via an earthquake.
Published on: Mar 3, 2016
Source: www.slideshare.net


Transcripts - Natural Disaster Evacuation Plan

  • 1. Preparing for a SanFranciscan Earthquake By Luke He!um
  • 2. Supply List 11 gallons of water for each family member Hand crank flashlight and radio Non-perishable foods for 1 week for each member Evacuation plan Road map
  • 3. Preventing Death Strict building code Mandatory backflow valves Stops unsanitary spreading of disease Educate the roughly 2000 schools $1.1 million for education $5 million education leaflets 15 seismic stations $50,000 (3 more than already)
  • 4. Routes to Leave Zone 1Zone 1 and all west of the Bay Zone 2 Half Moon BayRed part of zone 2 San Leandro and LafayetteSan Jose and Santa Clara Los Gatos and Saratoga
  • 5. Best Routes Zone 1 Zone 1 Zone 2 280 S San Bruno and Redwood CityZone 2 580, 680 Lafayette and Napa County
  • 6. Directions Out Zone 1: http://maps.google.com/maps?f=d&source=s_d&saddr=San+Francisco,+CA&daddr=Campbell,+CA&hl=en&geocode=FVJmQAIdKAe0- CkhAGkAbZqFgDH_rXbwZxNQSg%3BFf30OAId-zC7- CnpvtgtGTWOgDGYB34n0Q5ePQ&mra=ls&sll=37.520619,-122.03064&sspn=1.485657,3.537598&ie=UTF8&ll=37.775346,-122.419377&spn=0.000701,0.001727 &t=h&z=20 Zone 2: http://maps.google.com/maps?f=d&source=s_d&saddr=Oakland,+CA&daddr=Lafayette,+CA&hl=en&geocode=FVTZQAIdrUu2- CkD7aooi32FgDFnk3U11RW0cQ%3BFT4XQgIdfKC4-CmFj_qjfGCFgDEnaeQDXVgo- Q&mra=ls&sll=37.798933,-122.270966&sspn=0.370029,0.884399&g=Oakland&ie=UTF8&t=h&z=13 Zone 3: http://maps.google.com/maps?f=d&source=s_d&saddr=San+Jose,+CA&daddr=Los+Gatos,+CA&hl=en&geocode=FfrAOQId1Ae8- Cn1P_mK5MqPgDF7cZ_KCoyduQ%3BFXMIOAIdaNC6- Ck_A3dTNjSOgDGmjHSsAVNn7w&mra=ls&sll=37.356513,-121.81778&sspn=0.602559,1.221542&ie=UTF8&z=13
  • 7. How to Flee Fleeing necessary to avoid largest earthquake If no car/highway damage, families would drive to the refugee zones Contraflow highways 30% of population doesn’t have car They would use the large public transportation fleet Other areas unaffected will also be called upon for hotel infrastructure
  • 8. Stopping a RepeatMake sure residents areequipped with fresh water andfoodMake sure large water reserveson tap for fighting firesEquip families with tips onescaping a fireContinue brick housing to stopquick burning.
  • 9. Reducing Disease500,000 households outfit with backflow valves $150 apiece, but $125 tax credit. Stops disease and sewage spreadingMake sure all unaffected hospitals areready
  • 10. Recovery Temporary one room houses for400,000 displaced $500 million$250 tax credit if moved in with familyRubble clearing 100,000 households $130 million to clean up
  • 11. Total Cost 150000 for seismic stations 6.1 million for education 12.5 million for back flow valve tax credit 150 million for housing 130 million for clean up Total: $300,000,000

Related Documents