Nandipur Hydel Power Plant
 Constructed By RADE KONCAR
 Installed Capacity 13.8MW
 No. of units 3
 Capacity of each un...
Low head hydel power Station
 Low head hydro power applications use river current or tidal
flows of 20 meters (approximat...
Shaft
On which rotor and turbine are mounted
6
Kaplan turbine
 Speed 107rpm
 Runway speed 280rpm
 Head 22ft
 o/p 6500hp
7
Rotor
 Speed 107rpm
 Poles 56
 Winding wave
8
 Permanent magnet generator
DC gen, 120V, 14A, 107/276rpm
 Pilot exciter
3~ gen, 400V, 4.3 A, 107/276rpm
 Main pilot
Dc...
11
Grid Station 8.5MVA
5.75MVA
13
Air Circuit Breaker
Air Blast isolator
Potential
Transformer Current Transformer
Battery room
55 batteries of 12 volts connected in series were connected with
the pilot exciter and other dc operated equi...
CONTROL ROOM
16
17
Synchroscope
System Frequency
& indent Frequency
Needle is move
able,
In clock wise and
anti clock wise
direction to
sy...
Feeders panel
 5 feeders, 1 under fault
 Volts (KV)
 Current (A)
Transformer Voltage
 5750KVA, 8.5MVA, 250KVA
 Voltag...
Bus Bar coupling
 Current
Bus Bar Voltage
 Voltage
Unit panel
 3 units , 1 under fault
 Voltage
 Mega watts
 Frequen...
Generator
 Kilo Volts
 Current
Generator Protection
 Differential relay
 over current relay
 Over voltage relay
 Sta...
AVR
 Automatic voltage regulator
 Voltage 100V
 Current 19A
 25VA
 Frequency 50Hz
21
Signalization
 Light signal off
 Signal bulb testing
 Alarm horn off steady light
 Alarm bulb off
22
Temperature
 Turbine
◦ Lower guide bearing
◦ Upper guide bearing
◦ Thrust bearing
 Generator
◦ Windings
◦ Core
◦ Cold ai...
Governor
 Air vessel
◦ Operating pressure 20kg/sq. cm
◦ Volume 2 cubic meter
 Oil vessel
◦ Operating pressure 20kg/sq.cm...
Cooling system
 Exciter fan
 Exhaust fan
 Grease pump
 Cooling oil pump
 Oil leakage pump
 Water leakage pump
 Air ...
Any Question????
26
27
Nandipur Hydel Power Plant
Nandipur Hydel Power Plant
of 27

Nandipur Hydel Power Plant

Published on: Mar 3, 2016
Source: www.slideshare.net


Transcripts - Nandipur Hydel Power Plant

  • 1. Presented By: Maria Komal (2010-EE-547) Department of Electrical Engineering Rachna college of engineering and Technology Gujranwala, A constituent college of UET Lahore. 2
  • 2. Gujranwala Hydel Power Station, Nandipur 3
  • 3. Nandipur Hydel Power Plant  Constructed By RADE KONCAR  Installed Capacity 13.8MW  No. of units 3  Capacity of each unit 4.6MW  Head of water 24.4ft  Total cost of project 56.22MIL  Station Grid 66KV 4
  • 4. Low head hydel power Station  Low head hydro power applications use river current or tidal flows of 20 meters (approximately 66 feet) or less to produce energy.  No need to dam or retain water to create hydraulic head.  The head is only a few meters.  output varies with seasonal changes in stream flow 5
  • 5. Shaft On which rotor and turbine are mounted 6
  • 6. Kaplan turbine  Speed 107rpm  Runway speed 280rpm  Head 22ft  o/p 6500hp 7
  • 7. Rotor  Speed 107rpm  Poles 56  Winding wave 8
  • 8.  Permanent magnet generator DC gen, 120V, 14A, 107/276rpm  Pilot exciter 3~ gen, 400V, 4.3 A, 107/276rpm  Main pilot Dc gen, 120V, 459A, 107/276rpm  3~ Generator 3.3KV 1010A 107/276rpm 10
  • 9. 11
  • 10. Grid Station 8.5MVA 5.75MVA
  • 11. 13 Air Circuit Breaker Air Blast isolator
  • 12. Potential Transformer Current Transformer
  • 13. Battery room 55 batteries of 12 volts connected in series were connected with the pilot exciter and other dc operated equipments
  • 14. CONTROL ROOM 16
  • 15. 17 Synchroscope System Frequency & indent Frequency Needle is move able, In clock wise and anti clock wise direction to synchronize system and indent Block diagram of single unit Front bus bar Rear bus bar Emergency stop Guide blades opening Synchronizing switch
  • 16. Feeders panel  5 feeders, 1 under fault  Volts (KV)  Current (A) Transformer Voltage  5750KVA, 8.5MVA, 250KVA  Voltage  current 18
  • 17. Bus Bar coupling  Current Bus Bar Voltage  Voltage Unit panel  3 units , 1 under fault  Voltage  Mega watts  Frequency 19
  • 18. Generator  Kilo Volts  Current Generator Protection  Differential relay  over current relay  Over voltage relay  Stator earth leakage relay  Rotor earth leakage relay  Reserve power protection 20
  • 19. AVR  Automatic voltage regulator  Voltage 100V  Current 19A  25VA  Frequency 50Hz 21
  • 20. Signalization  Light signal off  Signal bulb testing  Alarm horn off steady light  Alarm bulb off 22
  • 21. Temperature  Turbine ◦ Lower guide bearing ◦ Upper guide bearing ◦ Thrust bearing  Generator ◦ Windings ◦ Core ◦ Cold air ◦ Hot air  Transformer 23
  • 22. Governor  Air vessel ◦ Operating pressure 20kg/sq. cm ◦ Volume 2 cubic meter  Oil vessel ◦ Operating pressure 20kg/sq.cm ◦ Volume 2 cubic meter 24
  • 23. Cooling system  Exciter fan  Exhaust fan  Grease pump  Cooling oil pump  Oil leakage pump  Water leakage pump  Air leakage pump  Governor oil pump  Auxiliary pump  Drainage pump 25
  • 24. Any Question???? 26
  • 25. 27