NARENDRA KUMARNARENDRA KUMAR
SARLA SADAN B-5/57,
SHIV VIHAR, PHASE-1,
KARAWAL NAGAR,
DELHI-110094
: 9911220757, 991105109...
Worked (From Apr 2011 till Dec 2014) as Manager- Projects for Andritz Hydro Pvt. Ltd.
Andritz Hydro encompassing the divis...
of the power plant. Majority of these projects are Cogeneration Based Captive Power Plants with
Chilling / Air-Conditionin...
6.) Worked (From June 2005 to June 2007) as Engineer- Projects for Tricolite Electricals industries.
Since 1947, Tricolite...
of 4

Narendra Kumar- Resume

Published on: Mar 3, 2016
Source: www.slideshare.net


Transcripts - Narendra Kumar- Resume

  • 1. NARENDRA KUMARNARENDRA KUMAR SARLA SADAN B-5/57, SHIV VIHAR, PHASE-1, KARAWAL NAGAR, DELHI-110094 : 9911220757, 9911051090 narendrakr2006@gmail.com Objective Seeking a challenging and progressive career in Engineering Projects aiming at constant up-gradation of both professionally & personally, in my career path with emphasis on hard work as well as making significant contribution to industry and driving professional satisfaction from it. Working Experience 1.) Presently working (From Jan 2016) as Manager- Projects for Flovel Energy Pvt. Ltd. Flovel provides turnkey Hydro Power Solutions – with cohesive integration of design, manufacturing, execution and service support. With companies incessant focus on quality and total customer satisfaction, Flovel has set new benchmarks in ‘implementation finesse' that have translated into sustainable benefits for customers. As a Manager- Projects reporting to the Head – Projects management my job responsibility are Job Profile:  To organize the Kick-Off Meeting of the project with customer & consultant.  Furnishing the micro level project plan.  Preparing the Monthly Project Review Sheet for management review.  Organizing the Monthly & Quarterly Project Review Meeting with in the organization (CFT Meetings) as well as with the customer as & when required.  To prepare & submit the monthly progress reports to the customer.  Preparing the Reports of the concern Areas & to forward it to the top management.  Conducting the Risk Assessment of the project for identifying the bottlenecks of the projects & communicate it to the team.  Coordinating with Vendor, Customer & the consultant for the timely approval of drawing & documents to adhere the manufacturing & the delivery schedule of the project.  Identifying & filing claims to the customer & maintaining the cash flow of the project.  Responsible for the project liasoning work.  Responsible for the on-time completion of the Project.  Responsible for taking care of the commercial issues related to the projects e.g. ABG, PBG, LC, Insurance Claim Settlement & LD etc.
  • 2. Worked (From Apr 2011 till Dec 2014) as Manager- Projects for Andritz Hydro Pvt. Ltd. Andritz Hydro encompassing the divisions Large Hydro, Service & Rehab, Compact Hydro, Generator Turbo & Pumps is a global supplier of the electromechanical system & services (water to wire) for hydro power plants. The Company is a leader in the world market for the hydraulic power generation having more then 170 years of turbine experience. At present we are having 30,000 + turbine installations all over the world with a capacity of more than 400,000 MWs. The company is the world Leader in Compact Hydro. As a Manager- Projects reporting to the Head – Projects management my job responsibility were Job Profile:  To organize the Kick-Off Meeting of the project with customer & consultant.  Furnishing the micro level project plan.  Preparing the Monthly Project Review Sheet for management review.  Organizing the Monthly & Quarterly Project Review Meeting with in the organization (CFT Meetings) as well as with the customer as & when required.  To prepare & submit the monthly progress reports to the customer.  Preparing the Reports of the concern Areas & to forward it to the top management.  Conducting the Risk Assessment of the project for identifying the bottlenecks of the projects & communicate it to the team.  Coordinating with Vendor, Customer & the consultant for the timely approval of drawing & documents to adhere the manufacturing & the delivery schedule of the project.  Identifying & filing claims to the customer & maintaining the cash flow of the project.  Responsible for the project liasoning work.  Responsible for the on-time completion of the Project.  Responsible for taking care of the commercial issues related to the projects e.g. ABG, PBG, LC, Insurance Claim Settlement & LD etc. Projects Executed in Andritz Hydro : 1. KUT HEP (3 X 8 MW, Horizontal Pelton) 2. Mailun Khola HEP (2 X 2.5 MW, Horizontal Francis) 3. Tangnu Romai II (3 X 2.5 MW, Horizontal Francis) 4. Kaliganga II (2 X 5 MW, Horizontal Francis) 5. Upper Nanti (2 X 7 MW, Horizontal Pelton) 6. Talwva HEP (2 X 2.5 MW, Horizontal Francis) 7. Ngoi Phat HEP (3 X 24 MW, Vertical Francis) 8. Namcan 2 HEP (2 X 10 MW, Horizontal Pelton) Projects Commissioned in Andritz Hydro : 1. Nanti HEP (2 X 7 MW, Horizontal Francis) 2. Jongini HEP (2 X 6 MW, Horizontal Francis) 2.) Worked (From Jul 2010 till March 2011) as Associate Manager- Projects for Green Power International Pvt. Ltd. Green Power International Pvt. Ltd. was established in early 2002 in close cooperation with MWM GmbH (formerly Deutz Power System GmbH) The Company is specialized in Power Generation Industry and thru complete O & M Contracts
  • 3. of the power plant. Majority of these projects are Cogeneration Based Captive Power Plants with Chilling / Air-Conditioning / Hot Water Recovery from Engine Jacket Water Heat and Steam from the heat of Engine Exhaust Gases. At present company is having 160+ installations all over India with a capacity of more than 300 MWs. As a Associate Manager- Projects reporting to the G M - Projects my job responsibility were Job Profile:  To organize the Order Transfer Meeting of the project  To organize the Kick-Off Meeting of the project  Furnishing the micro level project plan  Organizing the Weekly Project Review Meeting.  Preparing the Reports of the concern Areas & to forward it to the top management.  Conducting the Risk Assessment of the project & identifying the bottlenecks of the projects & communicate it to the team.  Handling labour, Coordinating with contractor & consultant  Responsible for the on-time completion of the Project.  Taking care of the commercial issues related to the projects e.g. ABG, PBG & LC etc. 3.) Worked (From Mar 2008 till July 2010) as Sr. Engineer- Projects for Motherson Sumi Systems Ltd. The largest manufacturer of the integrated wiring harness in India, the Sumi Motherson group holds over 65% share of the Indian passenger car wiring harness market. The group manufactures wiring harness for the entire cross-section of the automotive industry - from passenger cars to commercial vehicles, farm, material handling equipment & off-road vehicles. The group also manufactures specialized wiring harness for white goods, Office automation, medical diagnostic equipment, electrical & electronic equipment As a Sr. Engineer – Projects reporting to the Group Leader my job responsibility were Job Profile:  To organize the Kick-Off meeting of the project  Furnishing the micro level project plan  Organizing the Weekly Project Review Meeting.  Preparing the Reports of the concern Areas & to forward it to the top management.  Conducting the Risk Assessment of the project & identifying the bottlenecks of the projects & communicate it to the team.  Responsible for the various Electrical Installation Works in various manufacturing units across the Country e.g. DG Sets, 11000 / 415 V Substations Etc.  Handling labour, Coordinating with contractor & consultant  Responsible for the on-time completion of the work during new unit set-up. 5.) Worked (From June 2007 to Mar 2008) as Sr. Engineer- Projects for Jakson Engineers Limited. Since 1947, Jakson is a trusted name in the field of power GenSets in India and one of the largest OEM's to Cummins. Jakson is a 900 crore company with around 600 employees, having state of art manufacturing facilities at Daman and Noida The product range includes Diesel generating sets from 15 KVA to 2000 KVA, Gas generating sets from 50 KW to 1.7 MW and control panels for all applications like AMF, synchronizing, Load Sharing, PLC based generator controlled system etc.
  • 4. 6.) Worked (From June 2005 to June 2007) as Engineer- Projects for Tricolite Electricals industries. Since 1947, Tricolite is a pioneer name in the field of Power and Control Panels in India. Tricolite is a 1.6 Billion INR company with around 600 employees, having state of art manufacturing facilities at Sahibabad and Manesar. The product range includes LV Custom Built Switchgear Panels, MV Custom Built Switchgear Panels, Sandwich Bus ways Blokset Panels, DG Automation Panels, Low & Medium Voltage ATS etc. 7.) Worked (From Aug-2002 to May-2005) with OVN Trading Engineers Pvt. Ltd., Worked as an Engineer – Service reporting to the Manager -service for OVN Trading Engineers Pvt. Ltd. Authorized Dealer for C.D.S.S. – A premier company in the Service sector which deals maintenance and repair of main alternator maintenance and overhauling of Diesel Engines up to 2000 KVA. Lubricating, oil and coolant, single point Service Contract, power on rent, acoustic enclosures repowering and replacement upgrade kits. Educational Qualifications  B.Tech. in Electrical Engg from Delhi College OF Engineering, Bawana, Delhi in 2009  Diploma in Electrical Engg. From Pusa Polytechnic, Pusa, Delhi in 2002 with First division.  Passed 10+2 (Science Stream) from C.B.S.E., Delhi  Passed Matriculation from C.B.S.E., Delhi Hobbies and Extra Curricular Activities 1. Playing Cricket, Chess and Reading Books. 2. Winner of the Chess Championship in College Annual Games. 3. “C” Certificate in N.C.C. Personal Details Father’s Name : Shri Lila Dhar Date of Birth : 07 Aug 1980 Marital Status : Married Languages : English , Hindi Nationality : Indian DATE: PLACE: (NARENDRA KUMARNARENDRA KUMAR)

Related Documents