RESUME
MD. NASIR UDDIN AKANDA
Mob: 0088 01721 416834, 009647816487633
E-mail: akondaroba21@gmail.com
Skype ID : nasir.akan...
project site management and required all kind’s technical decision. Maintain a good
communication with our client all the ...
Duration : From 10
th
April 2007to 5
th
January 2009
Organization : Ananda Shipyard & slipways Ltd. (Bangladesh)
Position ...
Year of passing : 2010-2011
Result : CGPA 3.15 on scale of 4.00
Language Proficiency:-
Fluent in Bengali (Mother Tongue)
M...
of 4

Nasir-CV

Published on: Mar 3, 2016
Source: www.slideshare.net


Transcripts - Nasir-CV

  • 1. RESUME MD. NASIR UDDIN AKANDA Mob: 0088 01721 416834, 009647816487633 E-mail: akondaroba21@gmail.com Skype ID : nasir.akanda Career Objectives Established my professional career in a sector where I would get the chance to use my experience, technical and educational skills. I am looking for a new challenge in my career and I believe that my role in your organization offer me a chance to grow and further develop my retail career. Commitment: Respectively committed to efficiency of work with sincerity, honesty, punctuality and hard work. Professional Qualification Working Experience: 8(Eight) Years experience Duration : 1 st April 2014 to till now. Organization : Hanwah Engineering & Construction(Korean). BNcP (BISMAYAH NEW CITY PROJECT) Project in Iraq. Position : Mechanical Engineer Work Description : Installation of pipe line(UPVC & PPR Fusion welding, Metal pipe Fit-up & welding quality checking) and the Various type of Valves. Installation, alignment and commissioning of Break tank (Booster) pump system, Stom water pump station (Submersible) pump system, Sewage treatment plant (STP) pump system, Fuel oil pumping system .Vacuum pumps, water filtration systems, water tanks, pressurization systems mechanical and fire systems - such as Auto-spreading(CO2)Extinguisher, Fire Wall, Fire Door, Sprinkler etc. I have also experience about project site management and required all kind’s technical decision. Maintain a good communication with our client all the safety issue. Duration : 1 st December 2013 to 31 March 2014. Organization : The Pipeline Engineers And Associates Ltd.(PEAL). Under – Chevron Bangladesh Contractor - FOSTER WHEELER(THAILAND)LTD. Position : Construction Engineer (Mechanical). Work Description : Installation,Construction,Commissioning, Gas exploration & Maintenance of Nature Gas Plant at The Bibiyena Expansion Project (BYX), Chevron Bibiyena Gas Plant in Bangladesh. Duration : 05-January-2013 to 30 th November at this Project. Organization : The Pipeline Engineers And Associates Ltd.(PEAL). Under Hyundai Engineering Co.Ltd. Project to Gas Transmission Company Limited,(GTCL) Bangladesh. Design Build and Turnkey Supply,Installation,Construction,Commissioning,Operation & Maintenance of Nature Gas Transmission Pipeline Compressor Station at Ashuganj. (Contract No. HEC/GTCL/CSP/EPC/002,Date 21 October 2011). Position : Construction Engineer (Mechanical). Work Description : Installation of High Pressure Gas Pipe line & Compressor Project its different parts. Installation, alignment and commissioning of Gas Compressor &Turbine ,Air Cooler, Remote radiator, Utility/Gas Generators, Vessel, Potable water tank, High pressure centrifugal pump (Flare ko drum pump & Condensate pump),Flare Stack, Station Fittings & Equipment’s for Gas Turbine. Materials fabrications and checking the orientation and co-ordination as per drawing and ASME Standard code no - B31.3. I have also gathered a lot of experience about
  • 2. project site management and required all kind’s technical decision. Maintain a good communication with our client all the safety issue. Duration : From 1 st – September -2011 to 31 th December 2012. Organization : Pipeliners Limited. Under Hyundai Engineering Co.Ltd. Project to Gas Transmission Company Limited,(GTCL) Bangladesh. Design Build and Turnkey Supply,Installation,Construction,Testing, Commissioning and Operation & Maintenance of Nature Gas Transmission Pipeline Compressor Station at Elenga,Tangail. (Contract No. HEC/GTCL/CSP/EPC/002,Date 21 October 2011). Position Held : Construction Engineer (Mechanical). Work Description : Construction of 25.00 Km 762 mm (30”) OD x 1000 psig High pressure Natural Gas Transmission pipeline & Gas Compressor Station Project its different parts. Erection & installation, commissioning and alignment of Gas Turbine & Compressor, Air Cooler, Remote radiator, Utility/Gas Generators, Vessel, Potable water tank ,High pressure centrifugal pump(Flare ko drum pump & Condensate pump),Flare Stack, Station Fittings & Equipment’s for Gas Turbine. Materials fabrications and checking the orientation and co-ordination as per drawing and ASME standard code no - B31.3. I have also gathered a lot of experience about project site management and required all kind’s technical decision. Maintain a good communication with our client all the safety issue. Duration : From 3 rd December 2009 to12 th June 2011. Organization : Al Taj Electro Mechanical Engineering. Fujairah(UAE) Position Held : Mechanical Engineer Work Description : Mechanical Industrial Projects, Maintenance of water chiller Central AC and Package System, Boiler, heat exchangers, pressurization systems, air- compressors, air-dryers, Ducting work & Fabrication. Installation- Alignment and Commissioning they So Many kinds of High Pressure Pump. Maintenance the Various type of Valves, Insulation of Hot water, Fire water, Cooling water pipe line and Works of all Cooling system. Visual Inspection and report checking. Maintain a good communication with our client & all the safety issue. Duration : From 29 th January’2009 to 16 th November 2009, After Organization : Golden Window Construction LLC. Dubai (UAE). (Sub-Contact To Al Taj Engineering) Position Held : Site Engineer (Mechanical) Work Description : Installation of Water Pipe line and its different parts. Fit-up & welding quality checking and Documents preparation, Erection & installation of piping for the water pipe laying. Erection & installation of Valve Station Fittings & Equipment’s. Materials fabrications and checking the orientation and co-ordination as per drawing and ASME standard code no. B31.3.Ensuring the quality of welding joint in high and low pressure pipe(UG & AG), checking the leakage of pipes by hydro test, coating repair, wrapping, holyday detection, trenching, backfilling, service test & pneumatic test. I have also gathered a lot of experience about project site management and required all kind’s technical decision and Metal Test of Radiographic Examination(RE),Dye Penetration Test(DPT), Vacuum Box Testing(VBT),Magnetic Particle Examination(MPI), visual Inspection and report checking. Maintain a good communication with our client all the safety issue.
  • 3. Duration : From 10 th April 2007to 5 th January 2009 Organization : Ananda Shipyard & slipways Ltd. (Bangladesh) Position Held : Mechanical Engineer Work as an project : I have worked as an project Engineer for 5000 DWT container vessel, DWT 3000 Chemical Tanker, Water Supply vessel(1000DWT) LxBxD :56.70Mx11.00Mx5.00M,Fishing Trawler LxBxD :41Mx9Mx4.80M, Tug Boat, Crane Boat, Passenger Ferry, Catamaran type Passenger ship L x B :75.60Mx12.50M, ICE type Cargo Ship, Oil tanker vessel, Pilot vessel. Work Description : Erection, Installation & Alignment of different kinds of CNC Machine, Propeller, Motor & Pump, Different kinds of Fittings & Equipment’s for Turbine Generators. Install they All kinds of Pipe line, Materials fabrications And checking the Orientation and Co- ordination as per Drawing and ASME standard code no - B31.3.Maintain they Block Fabrication and All kinds of CNC Parts Delivery. Knowledge have HVAC & Ventilation system (Type: Marin central Air Conditioning, Split and compact models & cold Storage Make :De-Haan, Serves Ventilation ), Duct Fabrication and Installation. Arrange Daily progress report & monthly report. Distributing Manpower to their perfect job. I am Supervising Under to my Supervisor, Foreman, Technician and All of Workers. Ensure all machinery’ s are running good condition. Installation of All Machinery (Used in Sea-going Vessel) according to the Design & Drawing. I have also gathered a lot of experience about Project management And required all kind’s technical decision & Also Maintain a good communication with our client all the safety issue. Computer based knowledge:- Operation System : Microsoft Window XP, Windows 98 Soft wares : MS Word, MS Excel, MS Power Point, MS Access,Adobe Photoshop, Adobe Illustrator, DOS, Auto CAD. Internet skills : Basic Academic Records:-  Secondary School Certificate (S.S.C.) Institute : Dewangonj Islamia High School Board : Dhaka Group : Science Year of passing : 1998 Result : 2 nd Division(591)  Diploma in Engineering Institution : Dinajpur Polytechnic Institute Board : B.T.E.B. Dhaka Group : Mechanical Technology Year of passing : 2006-2007 Result : CGPA 2.59 on scale of 4.00  B.Sc. In Engineering University : Eastern University Group : Bachelor of Science Mechanical Engineering.
  • 4. Year of passing : 2010-2011 Result : CGPA 3.15 on scale of 4.00 Language Proficiency:- Fluent in Bengali (Mother Tongue) Moderate listening and speaking in English Moderate listening and speaking in Hindi Moderate listening and speaking in Arabic Personal Details:- Father’s Name : Abdul Khaleque Akanda Mother’s Name : Fatema Akanda Date of Birth : 06 th January 1983 Nationality : Bangladesh Religion : Islam Gender : Male Marital Status : Married Passport No : AD8716940 Declaration I undersigned, hereby declare that I will be responsible for any wrong information provided here. Md. Nasir Uddin Akanda Vill: Baluadanga,P.O – Dinajpur Sadar, P.S – Kotwali, Dist – Dinajpur Bangladesh. IRAQ - Current Mobile no :(009647816487633)

Related Documents